Job Completion Survey
- Reviewed By: Ken
- Location: Apple Valley, MN 55124
- Comment: Great Lakes renovated my bathroom. I had the old fiberglass shower unit removed and a new shower enclosure constructed using tile panels. I also had a new toilet installed, a new bathroom countertop with seamless sink installed, and grab bars for the bath tub, shower and toilet installed. The installation was estimated to take 3 days and was completed on time. It has been 6 months since the renovation and I am still very happy with the quality of the workmanship and materials.
-
Overall Rating